Timber villa timeline: from design to handover

Leopoldo Manini·2 min read·5 May 2025

Assembly is one construction stage. A villa’s programme includes investigations, design, permissions, foundations, services and finishes.

Separate the stages

Separate site assessment, design, permission procedures, orders and construction. Activities have different dependencies: the structure requires completed drawings and a prepared bearing surface, while some supplies need early selections. The final date must account for these conditions.

Prepare for assembly

Before elements arrive, check foundations, levels, access, lifting and available space. Coordinating openings and service routes avoids unplanned work during assembly. The speed of this stage also depends on preparation completed before materials are delivered.

Complete services and finishes

After the structure come services, linings, screeds, tiles, doors and completion work. Some operations require waiting periods or suitable material conditions. Late selections can affect orders and subsequent work. The programme should also identify decisions required from the client.

Update the programme when work changes

Weather, ground conditions, supplies and changes can affect the sequence. The project contact should assess changes and agree updates. Pools, connections and external works need coordination, particularly where separately phased. Assembly duration alone is not a handover date.

MANINI turnkey service: works and responsibilities

Frequently asked questions

When can a reliable handover date be set?

When work, site conditions, permissions and supplies are sufficiently defined to establish a programme.

Want to build your timber villa with MANINI?

Verify your project →
Keep reading

Related articles

Request information and download our guide

Do you have a building plot? *
Do you need financing? *